June 17, 2018

Please reload

Recent Posts

Frame Raising - the original flat pack!

July 30, 2018

1/2
Please reload

Featured Posts

Frame Raising - the original flat pack!

July 30, 2018

 Finally the day has arrived to raise the frame. I had some help from my friend Peter and his lorry in getting the frame from the workshop to the cottage. Thanks Peter!

 

 

 

 

 The garden is full of oak before hand. Once again, Ive enlisted the help of my friends at Traditional Oak Carpentry to raise the frame. The first thing to do was pre assemble the H-frames and trusses so as not to waste precious crane time. 

 

 

The crane arrives, its a beast! I cant get the whole thing in one shot

 

 

 

 

 The first H Frame being hoisted into position

 

 Now time for the floor spine and girders, before the next H frame is lifted into place

 

 

 The lower  level of the main house now in place

 

 Now the upper floor, starting with the wall plate

 

 

Here comes the first roof truss 

 

 

 

 One by one the roof trusses are lowered in place, and the purlins are then added to close it all in. Also you can see the front posts of the final bay are now in place. 

 

 

 Above are the sling braces ready for lifting into place. 

 

 

 

 The sling braces in place, this truss forms the opening to the full height porch at the rear of the extension, which opens up into the garden.

 

 

 

On the second day, still battling with the heat, we just about got all the rafters in place in time. Thanks to Rick and his team for all their hard work, and for Holly for all the food and drink that kept us going! 

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
This site was designed with the
.com
website builder. Create your website today.
Start Now