June 17, 2018

Please reload

Recent Posts

Frame Raising - the original flat pack!

July 30, 2018

1/2
Please reload

Featured Posts

The Side Extension Ground works

May 6, 2019

Once the new oak frame is up it was time to turn attention to the side extension ground works. Yes more digging, yes more concrete,block work and brickwork, but it mean the footprint for the future building is established.

 

The side extension will eventually house the utility room downstairs and a second much needed bathroom upstairs.

 

Again, like many other areas of the brickwork in this project. Im able to use the salvaged bricks from previous parts of the building. In fact the bricks used on the new side extension are the bricks from the old-lean that was there before!

 

 

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
This site was designed with the
.com
website builder. Create your website today.
Start Now